
The evening brought JtC North; time to finish the installation of the rotors.
Passenger side brackets torqued up...

Some detail shots of the bracket arrangement...



Bearings were packed with grease and installed in the hubs. Calipers were bolted up and time was spent routing the front brake hoses so they didn't rub on the chassis rails.
Before long, the wheels were back on and the Chev was back on the ground again...

The end is in sight with the booster/master left to do, along with the front brake lines.
J
No comments:
Post a Comment