Showing posts with label test frame. Show all posts
Showing posts with label test frame. Show all posts
Sunday, 8 November 2015
It lives!
We ignored supplying the starter solenoid through a relay and simply powered it via switched-power directly from the ignition switch... and ignored having a Park/Neutral inhibitor switch ;-)
The starter pack we had didn't have the herbs to kick it over so the battery from the Chev was quickly pilfered and pushed into surface.
We managed to forget to plug the vacuum hose to the brake booster (you can hear it in the video and JtC quickly found it), that was easily plugged with a bolt.
HUGE thanks again to JtC for all his work... especially his fab skills on the test frame, it is rock-solid!
J
Saturday, 7 November 2015
Wiring
A nice aspect of the test frame being 100% steel is the ability to earth back through the frame as if it were a car body; plus the C-rails meant there were locations to easily connect/disconnect earth straps...
We - thankfully - kept the battery terminals/cables off the VZ, which were pressed back into service...
Wiring the ignition switch and testing...
Red = power from the battery
Brown/white stripe = accessories
Orange = ignition on
Purple = starter
J
We - thankfully - kept the battery terminals/cables off the VZ, which were pressed back into service...
Wiring the ignition switch and testing...
Red = power from the battery
Brown/white stripe = accessories
Orange = ignition on
Purple = starter
J
Labels:
4L65E,
6.0L,
electrics,
engine,
gearbox,
ignition switch,
L76,
LS2,
swap,
test frame,
wiring
Thursday, 5 November 2015
Fans are go!
Red = positive 1st fan
Green positive = 2nd fan
Black = common negative
Not sure about yellow... low speed?
I've come to be a BIG fan (pardon the pun) of terminal strips! Perfect for temporarily wiring-up on the test frame.
J
Labels:
electrics,
engine,
fan,
L76,
LS2,
radiator fan,
swap,
test frame,
thermo
Fuel pump sorted
Normally it would be...
Solid purple = power
Solid black = earth
Because the VZ was a ute, it had a separate fuel pump control module to reduce the fuel pump speed (and therefore noise) under low demand as the pump is close to the cabin.
The white-striped wires connected the fuel pump to the fuel pump control module, with solid purple/solid black wired into the module from the harness on the computer side.
Make sense?
J
Friday, 30 October 2015
Cooling System Part 2 + Fuel
Cooling system topped-off with a reservoir from a VY SS and heater hoses salvaged from the VZ were used to connect it up.
The steam pipe is temporarily blanked off in the photo, but we'll buy a hose and plumb it to the radiator...
The fuel system was easy; we simply plumbed the fuel pump + filter from the VZ, using the stock lines...
Complete, ready for wiring...
J
The steam pipe is temporarily blanked off in the photo, but we'll buy a hose and plumb it to the radiator...
The fuel system was easy; we simply plumbed the fuel pump + filter from the VZ, using the stock lines...
Complete, ready for wiring...
J
Thursday, 29 October 2015
Test Bed Cooling Plumbed
Radiator + thermo fans out of a VT Series 2 SS (thanks eBay) and radiator hoses to suit...
We sat the radiator in some C-rail to pick up 2 x pegs in the base, on rubber pads to reduce vibration. A wooden block under the C-rail to give the right height, all tied-down with a mini ratchet strap and diagonally braced with some cable ladder...
J
We sat the radiator in some C-rail to pick up 2 x pegs in the base, on rubber pads to reduce vibration. A wooden block under the C-rail to give the right height, all tied-down with a mini ratchet strap and diagonally braced with some cable ladder...
J
Labels:
4L65E,
6.0L,
conversion,
cooling,
engine,
L76,
LS2,
radiator,
radiator fans,
swap,
test frame,
thermo fans
Friday, 23 October 2015
Engine Test Frame
The plan is to run the engine/transmission outside the Chev, to get it sorted before the 327/Powerglide comes out, to try and minimise the downtime.
This all means a test frame needed to be made up to mount it all.
The design is a simple rectangular base using Dexion-style racking sections:
A simple that allow adjustment to suit a variety of engine/gearbox combinations. JtC's welding skills well and truly came to the fore!
With the base frame welded up, castors on and the engine/gearbox mounts in place, it was time to lift... action shot!

Bolting-up...
Like a bought one!

With the L76 + 4L65E bolting in place, it is time to plumb the cooling circuit + fuel + electrics... stay tuned!
J
This all means a test frame needed to be made up to mount it all.
The design is a simple rectangular base using Dexion-style racking sections:
- Long pieces were cut-down to the required length with the angle brackets salvaged and welded back on at the cut end. Cross pieces at each end and the centre.
- 5PL feet on the end brackets for the 125 mm dia. castors (c/w lock-down brakes) to bolt to.
- Along each long-side of the base, JtC stitch-welded short lengths of C-section at the location of the engine and the gearbox. This would allow us to adjust the positions of the engine and gearbox cross-members, before clamping them into position.
- The gearbox uprights were C-rail sections with 100 x 50 x 5PL feet welded at each end. The feet allowed you to clamp-down on the base once the longitudinal position was reached.
- Gearbox cross-member was UA 40 x 20 with 100 x 50 x 5PL welded at each end. The plated ends were clamped to the upright C-sections once the correct height was reached.
- The engine cross member was heavier C-section to take the weight of the engine. Again, 5PL feet were welded to the ends to allow adjustment in the longitudinal direction, before clamping down.
- The engine mount uprights had feet at both ends, bottom feet to pick-up the cross member C-section and top for the standard LS2 engine mounts to bolt to.
A simple that allow adjustment to suit a variety of engine/gearbox combinations. JtC's welding skills well and truly came to the fore!
With the base frame welded up, castors on and the engine/gearbox mounts in place, it was time to lift... action shot!

Bolting-up...
Like a bought one!

With the L76 + 4L65E bolting in place, it is time to plumb the cooling circuit + fuel + electrics... stay tuned!
J
Labels:
4L65E,
6.0L,
conversion,
engine,
L76,
LS2,
swap,
test frame